Radisson Admiral Plaza Hotel
Radisson Admiral Achieved
36%
Reduction in Natural Gas Consumption
Services Provided
- Energy Audit
- Engineering Design, Drawings & Specifications for Energy Retrofit
- Applications for Financial Incentive
- Project Management, including Tendering & Contract Administration
- Commissioning
- Monitoring & Verification of Energy Savings
Energy Efficiency Measures Implemented
The following measures were implemented:
- High Efficiency Heating Boiler Retrofit
- Instantaneous Indirect Water Heaters for DHW and Elimination of DHW Storage Tank
- DHW Preheat With Make-up Air in Summer
- Fluid Cooler Loop By Pass in Winter Months
- Controls for Common Area Make-up Air Unit, Electric Baseboards and Heat Pumps
- Pool Heat Exchanger Heating Valve & Refrigeration Equipment Water Control Valve Repairs
Close This Window
|
MTCC#1377 - The Boulevard
MTCC#1377 Achieved
24%
Reduction in Overall Energy Costs
Services Provided
- Energy Audit
- Engineering Design, Drawings & Specifications for Energy Retrofit
- Applications for Financial Incentive
- Project Management, including Tendering & Contract Administration
- Commissioning
- Monitoring & Verification of Energy Savings
Energy Efficiency Measures Implemented
The following measures were implemented:
- VFD's on the Make-up Air Units
- Conversion of Make-up Air Units to Glycol Heating and Cooling System
- Conversion of DX Cooling for Make-up air units to Chilled Water Switch Over System*
- High Efficiency Heating Boiler Acting as a Lead Boiler - Heating System
- High Efficiency Condensing Boiler Acting as a Lead Boiler - DHW System
- Carbon Monoxide (CO) System to Control Exhaust Fans in the Parking Garage
- VFD on Domestic Cold Water Booster Pumps
- VFD on Cooling Tower Fan Motor
- Upgrade of the existing Building Automation System
- Whirlpool and Swimming Pool Covers
- Lighting Retrofit
Close This Window
|
MTCC#792 - Dynasty Towers
MTCC#792 Achieved
18%
Reduction in Overall Energy Costs
Services Provided
- Energy Audit
- Engineering Design, Drawings & Specifications for Energy Retrofit
- Applications for Financial Incentive
- Project Management, including Tendering & Contract Administration
- Commissioning
- Monitoring & Verification of Energy Savings
Energy Efficiency Measures Implemented
The following measures were implemented:
- Replaced Gas Fired Sections in Make-Up Air Units with Glycol Heating Coils
- DDC Building Automation System
- Cover for the Swimming Pool
- VFD on the Cooling Tower Fan
- Lighting Retrofit
- Low-flow Showerheads in the Change Rooms
- CO System to Control the Parking Garage Exhaust Fans
Close This Window
|
York Region Administrative Building
York Region Admin. Building Achieved
35%
Reduction in Natural Gas Consumption
&
17%
Reduction in Electricity Consumption
Services Provided
- Engineering Design, Drawings & Specifications for Energy Retrofit
- Applications for Financial Incentive
- Project Management, including Tendering & Contract Administration
- Construction Management
- Commissioning
- Monitoring & Verification of Energy Savings
Energy Efficiency Measures Implemented
The following measures were implemented:
- Heating Boiler Replacement
- VFD Air Handling Units Control
- Chilled Water Pumps VFD Control
- Hot Water Pumps VFD Control
- Atrium Return Fans Retrofit
- Building Lighting Retrofit
- Committee Rooms Re-Design
- Washrooms Occupancy Lighting Control
- Offices Occupancy Lighting Control
- Atrium Daylighting Control